EVENTS / TRAFFIC : Saturday Jan 6th thru Friday Jan 12th

EVENTS / TRAFFIC : Saturday Jan 6th thru Friday Jan 12th
December 28, 2017 Bob Cassinelli

 

JP Morgan Healthcare Conference

January 8 – 11, 2018 : Monday through Thursday
9,000 Attendees
200 Companies
Westin St. Francis

 

Hot Chocolate Run

Sunday, January 7:  The 5K/15K Hot Chocolate Run will take place inside Golden Gate Park extending to The Great Highway ending at Music Concourse Drive. The race starts at 7:30 a.m. from Martin Luther King Drive.  An approximate attendance of 10,000 runners is expected.

Traffic is anticipated to be heavy during the race along John F. Kennedy Drive, Martin Luther King Jr. Drive, The Great Highway and Lincoln Way between La Playa and The Great Highway.

For more details, please visit https://www.hotchocolate15k.com/sanfrancisco.

The following street closures will be required from 6 to 11:30 a.m.:

  • Lincoln Way between La Playa and Great Highway
  • Great Highway between Lincoln Way and Sloat Boulevard

 

Crusie Ship Schedule : January/February : Downloadable

Green indicates overnight Call

Note: A representatives of the Port reached out to Yellow to ask us to promote the arrivals of the ships to our drivers. We can’t say for sure but it might indicate they had a shortage cabs for the January 2nd arrival.

Screen Shot 5277

 

 

UPDATE:  Third Street Bridge Rehabilitation Project

https://goo.gl/maps/txySAdAa1h42

Through Friday, January 26, 2018:  The Third Street Bridge is undergoing counterweight maintenance in preparation for the upcoming Third Street Bridge Rehabilitation Project.

During the construction period, a full closure of the Third Street Bridge is required.  Access will be restricted to all vehicles, bicycles, and pedestrians between Berry and Terry A. Francois streets, for 24 hours per day.

Waterway access will remain open to watercraft traffic.  Access to private or commercial buildings and pedestrian pathway on either side of the bridge will be maintained at all times, however, delays should be expected.

Travelers are encouraged to plan ahead and may consider alternate routes:

Southbound Travel

  • Motorists: Use King Street to Interstate 280 South, then to 18th Street

Northbound Travel

  • Motorists: Use 16th Street to 7th Street, then to Brannan Street

For more project details, visit http://www.sfpublicworks.org/thirdstreetbridge.

War Memorial Opera House Schedule

https://sfopera.com/whats-on/

Davies Symphony Hall Schedule

http://www.sfsymphony.org/Buy-Tickets/Calendar

Need HELP or have some FEEDBACK?

Let us know